.

Translate to your own native language.

Sunday 8 July 2018

Job Opportunity at SGS Tanzania Superintendence Co. Ltd, Pipeline Construction Engineer

Job Opportunity at SGS Tanzania Superintendence Co. Ltd, Pipeline Construction Engineer
JOB OPPORTUNITY
Pipeline Construction Engineer
CONTEXT AND ENVIRONMENT
  • The EACOP project includes a 1445 km 24 in oil export pipeline. 8 above ground facilities, a green field marine terminal with an export jetty and a series of main line block valves and trace heating stations. 150 km for feeder lines from Upstream facilities will tie-in to the EACOP project. The Pipeline project will be the largest privately led with Government participation transnational infrastructure project ever undertaken in East African region. The project overall tonnage is estimated at 500,000 t of material and equipment:
  • Behind the numerous technical (the longest electrically heat traced pipeline in the world), environmental and social challenges faced by the project. Government of Uganda and Government of Tanzania agreed to develop EACOP project in a fast track mode. The project is aiming at a Ready for Start-up (RFSU) schedule not later than 36 months after FID;
  • The context is complex with numerous stakeholders, environmental and societal / local content stakes, three partners, two involved countries new to oil development (Uganda and Tanzania). and the need for project development in accordance with IFC standards to secure the necessary financing;
  • In the current context of low oil price, the project needs to be developed with low CAPEX 8 OPEX to support the development economics and enable FID while maintaining the technical quality of the installations, with high H3SE requirements and focus.
PRIMARY RESPONSIBILITIES
  • Provide primary interface between in country (Tanzania/Uganda) PPT organizations and EPcm PPT organization for all pipeline construction matters: – Support EACOP Pipeline Package Manager for all construction related matters during EPcm design phase and EPC contracts call for tender process:
  • Coordinate in Uganda and Tanzania all pipeline construction related matters prior to epC contractor’s mobilization: – Integrate pipeline construction supervisory team upon EPC contractor’s mobilization

DURATION AND NATURE OF CONTRACT
  • Starting date: August 2018
  • Duration: 36 Months Contract
  • Renewable: Yes – Location (country/site): Tanzania
  • Status (residential/rotational): Residential – If rotational. Rhythm (2*2 / 4*4):
Read more details here

Popular Posts this week.

Blog Archive